close
Norwegian Wood
In 2008 Techlift provided Heavy Lift and Transport planning and on site management for Ledwood Mechanical Engineering during a RCCU revamp at StatoilHydro’s Mongstad facility in Norway. The project included the shipping, transport and replacement of a 400te regenerator head, carried out during the turnaround.
Unable to read/write the source directory (/var/www/vhosts/techlift.co.uk/httpdocs/images/stories/norg/), please verify the directory permissions (Go to: Fix permissions tutorial)


